Vai al contenuto
Assistenza Tickalio

Centro assistenza

Guide per il negozio e il back office.

Guida pratica

Change an existing override’s window

Review a duration change for a saved rule.

Ultima revisione

Questo articolo è disponibile in inglese. Le traduzioni sono in arrivo.

Before you start — Shop-ERP

Open Returns → Window overrides and the intended target name. The example changes Everyday Accessories from 14 to 30 days. Choose Return window → 30 days.

Existing rule with a new duration staged

Follow the steps — Shop-ERP

Click Save. Check the target context and Current/New window in Review changes. Keep editing returns to the draft; Confirm changes commits it.

Existing-window review

Check the result — Shop-ERP

Check the saved 30-day value in the editor. Unlike new rule creation, this duration edit uses review. Changes only to the selected variants have a separate known Save issue.

Edited duration saved
Nota
These steps were checked with the actual application and fictional records in an isolated local preview. Connected persistence, permissions and downstream results remain unverified.

Valuta l’articolo

Ti è stato utile?

Dicci cosa potremmo spiegare meglio.

Guide correlate

Altre guide per Shop-ERP.

Supporto Tickalio

Un piccolo aiuto.Passi successivi chiari.

Parla con noi o sfoglia le guide.