Steg-för-steg-guide
A retention period is rejected
Correct a missing or out-of-range period before saving its unit.
Senast granskad
Den här artikeln finns på engelska. Översättningar är på väg.
På den här sidan
Read the period error — Shop-ERP
- In Retention rules, enable the intended rule before editing its period. Clearing the period, or entering zero in the example, leaves an invalid empty field. Selecting Save shows Enter 1–3,650 days, 1–120 months, or 1–10 years. The draft stays open.
Match the number to its unit — Shop-ERP
- The software accepts whole-number periods within the displayed limits: 1–3650 Days, 1–120 Months or 1–10 Years. These are input bounds, not retention-policy recommendations. The examples 3651 Days, 121 Months and 11 Years are rejected. When changing unit, check the number too.
Correct and review — Shop-ERP
- Enter a valid period from your approved policy with the intended unit. Select Save, check the rule, number and unit in Review changes and Confirm changes. If the entire draft is unwanted, use Discard. The invalid examples did not send a settings write.
Observera
These steps were checked with the actual application and fictional records in an isolated local preview. Connected persistence, permissions and downstream results remain unverified.
Bedöm artikeln
Var det här till hjälp?
Berätta vad vi kan förklara tydligare.
Relaterade guider
Fler guider för Shop-ERP.
- Enable a rule, review its period and unit, and disable it when needed.
Configure a retention rule
- Return from review, discard the draft and check the saved period is restored.
Discard unsaved retention changes
- Check saved settings, unsaved drafts and cleanup admission without starting a cleanup.
Run cleanup now is unavailable