Naar de inhoud
Tickalio ondersteuning

Helpcentrum

Handleidingen voor je winkel en backoffice.

Stappenplan

Change an existing override’s window

Review a duration change for a saved rule.

Laatst gecontroleerd

Dit artikel is beschikbaar in het Engels. Vertalingen volgen.

Before you start — Shop-ERP

Open Returns → Window overrides and the intended target name. The example changes Everyday Accessories from 14 to 30 days. Choose Return window → 30 days.

Existing rule with a new duration staged

Follow the steps — Shop-ERP

Click Save. Check the target context and Current/New window in Review changes. Keep editing returns to the draft; Confirm changes commits it.

Existing-window review

Check the result — Shop-ERP

Check the saved 30-day value in the editor. Unlike new rule creation, this duration edit uses review. Changes only to the selected variants have a separate known Save issue.

Edited duration saved
Opmerking
These steps were checked with the actual application and fictional records in an isolated local preview. Connected persistence, permissions and downstream results remain unverified.

Artikel beoordelen

Was dit nuttig?

Vertel ons wat duidelijker kan.

Gerelateerde handleidingen

Meer handleidingen voor Shop-ERP.

Tickalio support

Een beetje hulp.Duidelijke volgende stappen.

Praat met ons of blader door de handleidingen.