Skip to content
Tickalio support

Help center

Guides for your store and back office.

How-to guide

Find transfers and interpret receiving quantities and history

Find current and historical transfers, recover filtered results and distinguish accepted, rejected and remaining quantities.

Last reviewed

Before you start — Shop-ERP

Identify the intended reference and location. This guide keeps the current list, status views, sorting, search recovery, detail quantities, existing timeline and completed/canceled history together. It reads six fictional historical supplier-origin records in an isolated local preview; it does not perform their recorded operations. Product thumbnails are real licensed photographs and every screenshot is a real browser capture.

Follow the steps — Shop-ERP

  1. Check current transfers and their route. Open Stock operations → Transfers and check the location scope. All on this page contains current transfers, not completed or canceled history. The fictional example has four current records: one Draft, one Ready to ship and two In progress, all from North Quay Apparel to Tickalio Store. Read the reference, route, Received, Expected and Status together.
Check current transfers and their route — English interface
Check current transfers and their route — Spanish interface
  1. Use status views to narrow the queue. Choose In progress to show TR-DOC-103 and TR-DOC-104. Draft and Ready to ship each show their own single record in this example. A status view narrows the list; it does not advance a transfer or record a receipt. The two in-progress rows show different receiving progress: 3/14 and 10/14.
Use status views to narrow the queue — English interface
Use status views to narrow the queue — Spanish interface
  1. Sort the received quantities. Choose the Received column heading to sort. In this check, the first click puts 3/14 before 10/14; the next click reverses the order. The pictured descending result puts TR-DOC-104 first. The accessible heading describes the next sorting action. Received includes classified rejected quantities: it is not the accepted total.
Sort the received quantities — English interface
Sort the received quantities — Spanish interface
  1. Read partial receipt outcomes by variant. Open TR-DOC-104 and confirm origin and destination. Products shows Requested 14, Accepted 8, Damaged 1, Missing 1, Other rejected 0, Unclassified 0 and Remaining 4. S has 3 remaining and M has 1. The progress label is 10 of 14 received because 8 accepted plus 2 rejected have been classified. Shipment 1 is Partially received. These are historical sample outcomes; opening the record receives nothing.
Read partial receipt outcomes by variant — English interface
Read partial receipt outcomes by variant — Spanish interface
  1. Read the existing timeline and document notice. Scroll to Documents and Timeline. The stored events describe draft creation, readiness, transit and the historical partial receipt. Sample event text remains English in both interfaces. No documents are attached; the native notice says documents are available only during this browser session. This walkthrough reads existing events and does not post comments or attach files.
Read the existing timeline and document notice — English interface
Read the existing timeline and document notice — Spanish interface
  1. Find a transfer by its exact reference. Choose Back to transfers. In this checked flow it returns to the current All view with the default reference order, rather than restoring In progress and its sort. Search TR-DOC-103 to show the one matching record with 3/14 received. Check the reference and destination before opening a result with a similar name.
Find a transfer by its exact reference — English interface
Find a transfer by its exact reference — Spanish interface
  1. Recognize an empty search result. Searching NO-MATCH shows No transfers match and the Clear search and status button. This is a filtered empty result, not evidence that transfers were removed or completed. Check the query and whether the record belongs in current transfers or history.
Recognize an empty search result — English interface
Recognize an empty search result — Spanish interface
  1. Clear the search and recover current records. Choose Clear search and status. The search clears and All shows the four current records again. This changes the view only; references, quantities and lifecycle states remain unchanged.
Clear the search and recover current records — English interface
Clear the search and recover current records — Spanish interface
  1. Open completed and canceled history. From current Transfers, choose More actions → View transfer history. History All contains TR-DOC-105, Transferred at 14/14, and TR-DOC-106, Canceled at 0/14 with No date. The Transferred and Canceled tabs each narrow this example to one record. A blank expected date does not explain why a transfer was canceled; read its detail and existing events.
Open completed and canceled history — English interface
Open completed and canceled history — Spanish interface
  1. Check accepted and rejected totals on a completed record. Select Transferred and open TR-DOC-105. Its 14 of 14 received consists of Accepted 12, Damaged 1 and Missing 1, with Remaining 0. S has 9 accepted and 1 damaged; M has 3 accepted and 1 missing. Shipment 1 is Received. A completed progress bar and Transferred status do not mean all 14 units were accepted in good condition.
Check accepted and rejected totals on a completed record — English interface
Check accepted and rejected totals on a completed record — Spanish interface
  1. Read a canceled record without advancing it. Back to transfers returns to current All, even when the detail was opened from history. Reopen View transfer history, choose Canceled and open TR-DOC-106. It states This transfer was canceled and retains Requested 14, Accepted 0 and Remaining 14. Those outstanding quantities are part of the canceled record; this reading exercise does not reopen or receive them.
Read a canceled record without advancing it — English interface
Read a canceled record without advancing it — Spanish interface
  1. Distinguish a draft from receiving progress. Return to current transfers and open TR-DOC-101. Draft shows 0 of 14 received and Remaining 14. Its lifecycle starts at Draft. Mark as ready to ship is an action that would change the workflow; it is not needed to inspect the record and was not executed in this guide. Read-only inspection does not establish that stage changes, receiving or stock effects work.
Distinguish a draft from receiving progress — English interface
Distinguish a draft from receiving progress — Spanish interface
  1. Finish in the current transfer view. Choose Back to transfers and verify the current All view, empty search and four original records. To find historical completed or canceled work again, use View transfer history. This finishes the reading walkthrough without creating, moving, receiving or canceling goods.
Finish in the current transfer view — English interface
Finish in the current transfer view — Spanish interface

Check the result — Shop-ERP

Verify reference, origin/destination, lifecycle and variant-level outcomes together. Received progress counts classified accepted and rejected quantities; Remaining is the unclassified balance of requested units. Do not infer accepted stock from the progress bar alone.

A record seems missing: clear search/status, check the location scope and open history for completed/canceled records. Back loses the previous view: the checked detail Back control returns to current All; reopen history or reapply your view. A full bar includes issues: read Accepted, Damaged, Missing and other outcome columns.

This guide verifies local historical reading only. Creating/editing transfers, stage changes, receiving, duplicate/cancel/delete actions, comments and attachments, imports/exports, packages/labels/providers, node-origin transfers, other scopes/roles, server loaders and connected persistence/permissions/physical stock effects remain unverified. Visible action buttons are not evidence of permission enforcement. Existing native controls, labels and layout are preserved.

Note
These steps were checked with the actual application and fictional records in an isolated local preview. Connected persistence, permissions and downstream results remain unverified.

Article feedback

Was this helpful?

Tell us what could be clearer.

Related guides

More guidance for your Shop-ERP.

Tickalio support

A little help.Clear next steps.

Talk to us, or browse the guides.